Your message is queued; the CTO reads it on its next cycle (every few minutes) and replies below.
2026-06-26 15:29 CST
All tests green (75 passed). Full-year backtest continues (~70% through Sep 2025). No CTO action required this cycle; CTO monitoring.
No founder messages this cycle.
Status: Backtest still running (~70%, through Sep 2025), no errors. Suite green. Mid-run PDF command confirmed and ready for CEO execution tomorrow.
Next: Continue monitoring backtest; full-year CSV ETA Jul 2–8. Once delivered, I'll run post-backtest QA pipeline and generate final report.
Result: PASS ✅
......................................s................................. [ 93%]
....s [100%]
75 passed, 2 skipped in 1.54s
docs/forecaster‑validation.md.docs/deliverables/site‑screening.md.ForecastBacktest restored, export_daily_summary_csv() integrated. Test suite green with safe import test.brody/metrics/financial_metrics.py computes net savings, payback, NPV, ROI; brody/reporting/generator.py creates PDF report. Both covered by tests.brody/reporting/midrun_metrics.py with compute_midrun_metrics(). Test added.print_midrun_report() added to brody/reporting/midrun_metrics.py. Tested.brody/reporting/midrun_report_cli.py built and tested. Run it with python -m brody.reporting.midrun_report_cli.brody/qa/csv_validator.py built and tested; all tests pass.brody/qa/csv_validator.py includes run_qa_report() CLI (tested).brody/qa/trajectory_validation.py with trajectory/outlier detection functions, tested.brody/qa/run_post_backtest_qa.py with run_full_qa() function and CLI; tests/test_qa_runner.py covers it.brody/qa/post_backtest_qa.ipynb ready to run when CSV available.python -m brody.reporting.generator --csv <csv_path> --output <output.pdf>.tests/test_postbacktest_pipeline.py) passes, suite green (75 passed).brody/postbacktest/pipeline.py chains QA and final report generation into one command. Awaiting full‑year CSV to execute.(refined by CTO — cycle 140, 2026‑06‑26 14:53 CST)
(refined by CTO — cycle 140, 2026-06-26 14:54 CST)
ktest run continues (~70%, no errors). All tests green (73 passed). No code changes needed this cycle — monitoring until the full-year CSV lands.
Monitoring backtest: 73 tests green, QA notebook ready. Full-year CSV expected by 2026-07-08.
Added CLI to PDF report generator so the CEO can produce the mid‑run backtest PDF. Generator code is unchanged and tests pass; the founder can now run the command directly.
Cycle 136: wrote brody/reporting/generator.py
Cycle 136: tests PASS (73 passed, 2 skipped in 1.48s)
Created convenience script scripts/generate_midrun_pdf.py for the CEO to generate the mid‑run PDF; compiled the latest technical roadmap with this new tool.
Cycle 137: wrote scripts/generate_midrun_pdf.py
Cycle 137: tests PASS (73 passed, 2 skipped in 1.53s)
Built post-backtest automation pipeline (brody/postbacktest/pipeline.py) that chains QA and final report generation into one command. Added test coverage for the pipeline. Ready for full-year CSV to execute. Updated roadmap accordingly.
Cycle 138: wrote brody/postbacktest/__init__.py, brody/postbacktest/pipeline.py, tests/test_postbacktest_pipeline.py
Cycle 138: tests FAIL (1 error in 1.41s)
Fix post-backtest pipeline test import error: restore missing brody/metrics/financial_metrics.py with FinancialMetrics class.
Cycle 139: wrote brody/metrics/financial_metrics.py
Cycle 139: tests PASS (75 passed, 2 skipped in 1.54s)
Post-backtest pipeline test fixed (cycle 140), suite green at 75 passed. Backtest still over 70% through Sep 2025, ETA Jul 2–8. Monitoring continues.
Backtest remains green (75 passed, 2 skipped); mid-run PDF CLI ready for CEO execution on Jun 27. No code changes needed this cycle.
Confirmed backtest running smoothly, no errors, tests green. CEO's post‑backtest plan noted.
Backtest continues (~70% through Sep 2025), tests green (75/2). QA pipeline confirmed ready for CSV drop. No code changes this cycle — honoring founder's 'no new features' directive.
All tests green (75 passed). Full-year backtest continues (~70% through Sep 2025). No CTO action required this cycle; CTO monitoring.