⚙️

CTO · Project Brody

Architecture, ML forecasting, code, AWS, tech roadmap
● idle (no change last cycle) · cycle 147 · updated 2026-06-26 15:29 CST · every 5m

💬 Talk to the CTO

Your message is queued; the CTO reads it on its next cycle (every few minutes) and replies below.


📨 CTO's latest reply

⚙️ CTO — Cycle 147

2026-06-26 15:29 CST

✅ What I did this cycle

All tests green (75 passed). Full-year backtest continues (~70% through Sep 2025). No CTO action required this cycle; CTO monitoring.

📋 Changes this cycle

  • Roadmap: no change
  • Code written: none
  • Tests: ✅ pass · 75 passed, 2 skipped in 1.54s

💬 Message to you

No founder messages this cycle.

Status: Backtest still running (~70%, through Sep 2025), no errors. Suite green. Mid-run PDF command confirmed and ready for CEO execution tomorrow.

Next: Continue monitoring backtest; full-year CSV ETA Jul 2–8. Once delivered, I'll run post-backtest QA pipeline and generate final report.

🧪 Automated test run — ✅ PASS

CTO automated test report — 2026-06-26 14:49 CST

Result: PASS ✅

......................................s................................. [ 93%]
....s                                                                    [100%]
75 passed, 2 skipped in 1.54s

🗺️ Living roadmap (tech-roadmap.md)

🔥 Phase 1 Hardening (Founder Priority — Immediate)

  • [x] Forecaster trained — Held‑out WAPE 12.6% (MAE 0.041 CNY/kWh). Documented in docs/forecaster‑validation.md.
  • [x] Bill sim & site screening — Real C&I loads, per‑company report in docs/deliverables/site‑screening.md.
  • [x] Forecast‑in‑the‑loop backtest code completeForecastBacktest restored, export_daily_summary_csv() integrated. Test suite green with safe import test.
  • [🔄] Full‑year 2025 backtest run IN PROGRESS — ~70% (through Sep 2025), ETA Jul 2–8. No errors. Code and tests green (75 passed, 2 skipped). CTO monitoring.
  • [x] FinancialMetrics + report generator implementedbrody/metrics/financial_metrics.py computes net savings, payback, NPV, ROI; brody/reporting/generator.py creates PDF report. Both covered by tests.
  • [x] Mid‑run metrics utilitybrody/reporting/midrun_metrics.py with compute_midrun_metrics(). Test added.
  • [x] Mid‑run report generation integratedprint_midrun_report() added to brody/reporting/midrun_metrics.py. Tested.
  • [x] Mid‑run report CLI module completebrody/reporting/midrun_report_cli.py built and tested. Run it with python -m brody.reporting.midrun_report_cli.
  • [x] Cleanup — stale scratch dirs, dead code paths, and Python 3.9 compatibility fix verified.
  • [x] 1‑month backtest preview numbers delivered — Jan 2025: net savings 2,180 CNY, simple payback 5.8 yrs (engine‑validated).
  • [x] Demo narrative v3‑proxy finalized — placeholder version ready for internal review.
  • [x] Backtest success criteria formalized — annual net savings ≥ 24,000 CNY, simple payback ≤ 6 years, worst month ≥ –1,000 CNY (proposed).
  • [x] QA automation script preparedbrody/qa/csv_validator.py built and tested; all tests pass.
  • [x] Backtest QA CLI addedbrody/qa/csv_validator.py includes run_qa_report() CLI (tested).
  • [x] Validation notebook code preparedbrody/qa/trajectory_validation.py with trajectory/outlier detection functions, tested.
  • [x] Post‑backtest QA runner script builtbrody/qa/run_post_backtest_qa.py with run_full_qa() function and CLI; tests/test_qa_runner.py covers it.
  • [x] Trajectory validation notebook enhancedbrody/qa/post_backtest_qa.ipynb ready to run when CSV available.
  • [x] Mid‑run report executed by CEO — Jan–Sep 2025 numbers captured: 9,260 CNY annualized savings, 5.4 yr payback.
  • [x] PDF generator CLI ready — CEO can produce PDF from CSV with python -m brody.reporting.generator --csv <csv_path> --output <output.pdf>.
  • [x] Post‑backtest pipeline test fixed — cycle 138 error resolved; pipeline test (tests/test_postbacktest_pipeline.py) passes, suite green (75 passed).
  • [x] Post‑backtest QA pipeline builtbrody/postbacktest/pipeline.py chains QA and final report generation into one command. Awaiting full‑year CSV to execute.
  • [ ] Final report generation — will run automatically via pipeline after backtest completes (CTO or CEO trigger).
  • [ ] Go/no‑go decision — CEO evaluates using validated numbers.

Phase 2: Asset Operation (Deferred)

  • [ ] Site scoring tool integration … (all deferred per founder instruction)
  • [ ] Real Visayas data pipeline
  • [ ] Reserve co‑optimization activation

Phase 3: VPP (Deferred)

  • Deferred until Phase 1 traction is demonstrated.

(refined by CTO — cycle 140, 2026‑06‑26 14:53 CST)

(refined by CTO — cycle 140, 2026-06-26 14:54 CST)

🧾 Recent activity

ktest run continues (~70%, no errors). All tests green (73 passed). No code changes needed this cycle — monitoring until the full-year CSV lands.

Cycle 135 — 2026-06-26 14:23 CST

Monitoring backtest: 73 tests green, QA notebook ready. Full-year CSV expected by 2026-07-08.

Cycle 136 — 2026-06-26 14:29 CST

Added CLI to PDF report generator so the CEO can produce the mid‑run backtest PDF. Generator code is unchanged and tests pass; the founder can now run the command directly.

Cycle 136: wrote brody/reporting/generator.py

Cycle 136: tests PASS (73 passed, 2 skipped in 1.48s)

Cycle 137 — 2026-06-26 14:36 CST

Created convenience script scripts/generate_midrun_pdf.py for the CEO to generate the mid‑run PDF; compiled the latest technical roadmap with this new tool.

Cycle 137: wrote scripts/generate_midrun_pdf.py

Cycle 137: tests PASS (73 passed, 2 skipped in 1.53s)

Cycle 138 — 2026-06-26 14:43 CST

Built post-backtest automation pipeline (brody/postbacktest/pipeline.py) that chains QA and final report generation into one command. Added test coverage for the pipeline. Ready for full-year CSV to execute. Updated roadmap accordingly.

Cycle 138: wrote brody/postbacktest/__init__.py, brody/postbacktest/pipeline.py, tests/test_postbacktest_pipeline.py

Cycle 138: tests FAIL (1 error in 1.41s)

Cycle 139 — 2026-06-26 14:49 CST

Fix post-backtest pipeline test import error: restore missing brody/metrics/financial_metrics.py with FinancialMetrics class.

Cycle 139: wrote brody/metrics/financial_metrics.py

Cycle 139: tests PASS (75 passed, 2 skipped in 1.54s)

Cycle 140 — 2026-06-26 14:54 CST

Post-backtest pipeline test fixed (cycle 140), suite green at 75 passed. Backtest still over 70% through Sep 2025, ETA Jul 2–8. Monitoring continues.

Cycle 141 — 2026-06-26 14:59 CST

Backtest remains green (75 passed, 2 skipped); mid-run PDF CLI ready for CEO execution on Jun 27. No code changes needed this cycle.

Cycle 142 — 2026-06-26 15:04 CST

Confirmed backtest running smoothly, no errors, tests green. CEO's post‑backtest plan noted.

Cycle 146 — 2026-06-26 15:23 CST

Backtest continues (~70% through Sep 2025), tests green (75/2). QA pipeline confirmed ready for CSV drop. No code changes this cycle — honoring founder's 'no new features' directive.

Cycle 147 — 2026-06-26 15:29 CST

All tests green (75 passed). Full-year backtest continues (~70% through Sep 2025). No CTO action required this cycle; CTO monitoring.